Download Chapter 5_FlowSimulation
Transcript
Royal Haskoning Triwaco User's Manual The parameters representing the aquitards don't need any modification. The input file can be generated as usual selecting 'Generate input' from the 'Calibration' pull down menu. It is recommended to check the input file and to remove the lines defining the parameter TXx, which may appear in the input file if both TXx and PXx are defined in the same data set. Recharge and rewetting The recharge is computed for each cell from the corresponding Triwaco parameter (generally top system parameter RP1). By default recharge is supposed to take place in the uppermost active cell (NRCHOP = 3 in the RCH1 package). Unlike Triwaco ModFlow allows cells to go dry if the water table falls below the base of the aquifer (in Triwaco only the uppermost layer may become dry, resulting in a zero value for this aquifer's transmissivity). For cells that become dry the value of 1.0 E+32 is assumed, signifying the cell is inactive and does not participate in the groundwater flow. However, whenever the water table rises above the aquifer's base elevation the cell should participate in the groundwater flow again. This process is called 'rewetting' and is supposed to be active. Values for the rewetting threshold and the frequency of updating are fixed. Rivers Streams and rivers are usually defined by line elements and will be converted to a combination of ModFlow's DRAIN- and GHB-package, thus accounting for differences in drainage and infiltration resistances. Generally this approach will be permitted as long as the groundwater head does not fall below the bottom level of the river. However, in cases very low groundwater heads may be expected the linear relation between the head difference and the infiltration flux is not valid any more. In that case the RIV-package should be used in stead of the GHB-package. The user can specify which line elements are to be defined by the RIV-package by adding the parameter BRx and modifying Rax. For those rivers that should be converted to the RIV-package, the river activity parameter RAx should be set to 3. In addition the parameter BRx is added, representing the river's bottom elevation. This parameter can be added selecting 'Add' 'User Defined' from the 'Parameter' pull down menu and filling in the parameter definition window. After having allocated all parameters the input file can be generated as usual. 5 Execution of Groundwater Flow Simulations: FLAIRS and MODFLOW-35