Download c hapter

Transcript
Installation
 When possible, have process available near both the low and high end of the
measurement span. A density change of at minimum of 0.1 SpG is a common
requirement.
 When possible, have the material used for periodic standardization of the gauge
available (usually water).
 Do not remove the lock or shield on the source holder. Notify VEGA Field Service if
there is damage to the source holder.
2-10
DSGH Installation and Operation Guide