Download FINAL PROJECT REPORT
Transcript
Ecowatt Table 3 - Team Member Roles Brianna Bultema – Biological Components Achyut Shrestha – MFC Monitoring Biological Research Bacteria Management MFC inner workings Chris Michaels – Output Regulation Electrical research MFC monitoring design Testing experimental setup Jared Huffman - Tank / Case Design Electrical research Regulator circuit design Testing prototype Cube Structure Feeding System Tank and Case Design 6.1.4. Schedule At the start of the Fall 2007 Semester, Ecowatt met to determine a schedule for the Fall Semester. The schedule was determined based on each member’s individual schedule as well as a list of project due dates provided by the Professors of Senior Design. The task list for Senior Design was supplemented with other important tasks the team deemed important and relevant to the schedule. The team estimated how many days or weeks each task was expected to require and assembled a Gantt Chart of the results (Figure 3 - Gantt Chart of Fall Semester Plan). Throughout the Fall 2007 Semester, Ecowatt met regularly to discuss important matters about the project. The schedule was frequently discussed; the team changed the schedule as appropriate to meet more specific or changing deadlines for Senior Design as well as to compensate for unforeseen scheduling conflicts and lead times for ordering materials. Towards the end of the Fall 2007 Semester, Ecowatt met to again to analyze the team’s adherence to the predetermined schedule. The team updated and discussed an “Actual” Gantt Chart for the Fall 2007 Semester (Figure 4 - Gantt Chart of Fall Semester Actual). The research portions of the project, originally perceived as preceding all other testing and prototyping, continued throughout the entire semester. The lead-time for ordering bacteria was not accounted for and thus required an adjustment to the schedule as well. However, the team stayed on schedule within reason, keeping each of the Senior Design deadlines as well as many of the team’s own additional tasks. For the Spring 2008 Semester, Ecowatt planned a schedule much as it did for the Fall, and the goal was to plan for the rest of the year before the end of the Fall Semester. However, the Spring 2008 Senior Design Schedule was not yet confirmed at that time. Prof Wunder was able to provide the Spring 2007 Senior Design Schedule as a starting point; this was later updated to match the official course schedule. From each individual team member’s own 21