Download FINAL PROJECT REPORT

Transcript
Ecowatt
Table 3 - Team Member Roles
Brianna Bultema – Biological Components
Achyut Shrestha – MFC Monitoring
Biological Research
Bacteria Management
MFC inner workings
Chris Michaels – Output Regulation
Electrical research
MFC monitoring design
Testing experimental setup
Jared Huffman - Tank / Case Design
Electrical research
Regulator circuit design
Testing prototype
Cube Structure
Feeding System
Tank and Case Design
6.1.4. Schedule
At the start of the Fall 2007 Semester, Ecowatt met to determine a schedule for the Fall
Semester. The schedule was determined based on each member’s individual schedule as well
as a list of project due dates provided by the Professors of Senior Design. The task list for
Senior Design was supplemented with other important tasks the team deemed important and
relevant to the schedule. The team estimated how many days or weeks each task was expected
to require and assembled a Gantt Chart of the results (Figure 3 - Gantt Chart of Fall Semester
Plan).
Throughout the Fall 2007 Semester, Ecowatt met regularly to discuss important matters
about the project. The schedule was frequently discussed; the team changed the schedule as
appropriate to meet more specific or changing deadlines for Senior Design as well as to
compensate for unforeseen scheduling conflicts and lead times for ordering materials.
Towards the end of the Fall 2007 Semester, Ecowatt met to again to analyze the team’s
adherence to the predetermined schedule. The team updated and discussed an “Actual” Gantt
Chart for the Fall 2007 Semester (Figure 4 - Gantt Chart of Fall Semester Actual). The research
portions of the project, originally perceived as preceding all other testing and prototyping,
continued throughout the entire semester. The lead-time for ordering bacteria was not
accounted for and thus required an adjustment to the schedule as well. However, the team
stayed on schedule within reason, keeping each of the Senior Design deadlines as well as many
of the team’s own additional tasks.
For the Spring 2008 Semester, Ecowatt planned a schedule much as it did for the Fall,
and the goal was to plan for the rest of the year before the end of the Fall Semester. However,
the Spring 2008 Senior Design Schedule was not yet confirmed at that time. Prof Wunder was
able to provide the Spring 2007 Senior Design Schedule as a starting point; this was later
updated to match the official course schedule. From each individual team member’s own
21