Download Bosch GWH C 920 ESC Specifications
Transcript
Installation instructions Minimum 3” Gas supply Cap Fig. 23 Gas connection Once connections are made, check for gas leaks at all joints. Apply some gas leak detection solution to all gas fittings. Bubbles are a sign of a leak. A combustible gas detector may also be used to detect for leaks. Inlet gas particle screen (included) Gas piping Fig. 24 Danger: If you have a leak, shut off the gas. Tighten appropriate fittings to stop leak. Turn the gas on and check again with a gas leak detection solution. Never test for gas leaks using a match or flame. GAS LINE SIZING The gas supply piping for a single heater should be sized for a maximum draw of 225,000 BTUH. Measure the length of gas supply line from the building's gas main to the heater and use the tables in Fig. 25, page 24 or the gas line manufacturer’s sizing tables to determine the pipe diameter necessary. If there are more gas appliances on the line, size the gas line according to the total maximum amount of BTU input rating of all appliances combined. Note: Undersizing the gas line may result in diminished hot water flow rate and temperature. See chapter 3.13, page 29 for the procedure to measure gas pressure. Proper gas pressure must be confirmed at time of installation. 6 720 608 836 23