Download Technical Reference Manual
Transcript
EVS Broadcast Equipment SA Issue 12.05.A - May 2014 5. Hardware Installation and Cabling 5.1. Rack Installation Unpacking Upon receipt of the equipment examine packing for obvious signs of damage. If damaged, do not unpack and inform the carrier immediately. Check thanks to the included packing list if all the items are present and if they show any mechanical damage. If yes, report damage or the missing parts to EVS or their appropriate representative. Ventilation and Rack Mounting Adequate ventilation is obviously required for optimum performance. As a result of this consideration, ensure that no other equipment is located close to the mainframe. Warning • Remember that fans are used to air cool the equipment and protect it from overheating. • Do not block fans intakes during operations. Having regard to the weight of the server chassis, support guides are required for this unit into the rack mount. The front ears of the unit are not designed to support its full weight. Applying full weight on these might result in bending the metal plate. Boards Checking The main power switch is located at the front side (lower right corner) of the unit. Before turning on the power, open the front door of Video disk recorder unit to check if all boards fit into their guides. If a board is out of its guides, remove carefully the board and replace it in the same slot. 46 5. Hardware Installation and Cabling