Download Technical Publications LOGIQ e Quick Guide

Transcript
LOGIQ e Quick Guide
Direction 5314624-100 Rev. 2
Power Off
Full Maintenance Reboot
To power down the system:
You can select Full Maintenance Reboot to fully
restart the system. It is used when installing new
software or you feel the system response is getting
slower.
1. Press the Power On/Off switch at the front of
the system once.
2. The System-Exit window is displayed.
1. Press the Power On/Off switch at the front of
the system once. Using the Trackball and
Select key, select Full Maintenance Reboot.
2. The reminder window is displayed.
3. Using the Trackball or Select key, select
Shutdown.
The shutdown process takes a few seconds
and is complete when the power status LED
(For LED status, refer to Figure 9. on
page 10) is turned off.
4. Disconnect the probes.
Clean or disinfect all probes as necessary.
Store them in their shipping cases to avoid
damage.
3. Click OK to continue the process. The full
maintenance reboot process takes about 2
minutes and is completed when the application
is restarted.
NOTE: For the purpose of performance
improvement, system may require you to perform
an auto full maintenance reboot even you are
selecting Shutdown. The reminder window will be
displayed:
5. Close LCD cover.
Prepare Exam
11
Click OK to continue the process. The auto full
maintenance reboot process takes about 2 minutes,
and is completed when the system is shut down
automatically.
Starting an Exam
You need to select a pre-configured dataflow that
sets up the ultrasound system to work according to
the services associated to the dataflow.
1. Select your Operator Login and type in your
Password:
2. Press OK.
3. Fill in the New Patient menu as described on
page 12.
OR,
If the patient name is on the patient record list,
Trackball to the patient’s name to highlight the
name, (or perform a search to locate the patient).