Back End Processor Installation Procedure
When performing this procedure, handle boards carefully and take the following precautionary measures:
CAUTION: DO NOT TOUCH ANY BOARDS WITH INTEGRATED CIRCUITS PRIOR TO
TAKING THE NECESSARY ESD PRECAUTIONS:
1.ALWAYS CONNECT YOURSELF, VIA AN ARM-WRIST STRAP, TO THE ADVISED ESD
CONNECTION POINT LOCATED ON THE REAR OF THE SCANNER (TO THE RIGHT OF
THE POWER CONNECTOR).
2.FOLLOW GENERAL GUIDELINES FOR HANDLING OF ELECTROSTATIC SENSITIVE
EQUIPMENT.
NOTE:
Care should also be taken to install the boards in the correct slots - refer to Figure 8-50 on page 8-56 and
Figure 8-51 on page 8-57, as applicable.
1) Install the MO Driver into the new BEP, as described in the MO Drive Installation Procedure on page
8 - 81, if applicable.
2) Remove the Octopus Card Holder as described in the BEP2 - Octopus Card Holder Removal
Procedure on page 8 - 68.
3) Install the SCSI Board, as described in the SCSI Board Installation Procedure on page 8 - 73, if
applicable.
4) Install the ECG Module, as described in the BEP2 - ECG Module Installation Procedure on page 8 - 86.
5) Install the PC VIC Assembly, as described in the PC-VIC Installation Procedure on page 8 - 89.
6) Install the Plug and Scan Battery (if applicable), as described in the Plug & Scan Battery Installation
Procedure on page 8 - 71.
7) Install the Plug and Scan Board (if applicable), as described in the Plug & Scan Board Installation
Procedure on page 8 - 69.
8) Install the PC2IP Board, as described in the PC2IP Board Installation Procedure on page 8 - 75.
9.) Install the Frame Grabber Board (RFI systems only), as described in the Frame Grabber Board
Installation Procedure on page 8 - 76.
10) Install the Keyboard Control Card, as described in the Keyboard Control Board Installation
Procedure on page 8 - 77.
11) Install the Octopus Card Holder as described in the BEP2 - Octopus Card Holder Installation
Procedure on page 8 - 68.
12.)Carefully return the new BEP to the original position on the machine chassis.
Note: When replacing a BEP, the HASP key must be moved to the new BEP. Ensure that the
HASP key is connected to the parallel port. Make sure that the nominal voltage and range
is set correctly in the Technical Support Tab under System Configuration. (This must be
done by an authorized GE representative). Software version 2.3 or above must be
re-installed - see the Software Installation/Upgrade Procedure on page 8 - 121.
Slide the BEP slightly outwards and proceed to reconnect all the cables at the rear of the BEP as
described in the following steps (refer to Figure 8-55 on page 8-61). Make sure that the HASP key
(option plug) is connected to the correct connector (parallel port).
8-60