Download Installation instructions
Transcript
15 Reports 15 Reports 15.1 Start-up report • Enter your signature and the date after completing the start-up activities. Start-up activities Page Measurement results 1. Check for gas leaks 41 F 2. Fill the heating system 41 F - Pre-pressure expansion vessel (refer to the installation instructions for the expansion - vessel) _____________ psi Heating system filling pressure _____________ psi 3. Fill the condensate trap with water 4. Write down the gas characteristics 42 F _____________ btu/ft.3 Heat input _____________ btu/PM3 Heat output 43 F 6. Check the air/flue gas connection 43 F 7. Checking the appliance configuration 44 F 8. 44 _____________ " W.C. 10. Carry out a leakage test in operating conditions 45 F 11. Check and adjust the flue gases CO2 emissions 45 12. Carry out a function test 47 5. Bleed the gas supply valve Measure the gas inlet pressure (working pressure) - Measure the ionization current 47 13. Measure the pH-value _____________ ppm F _____________ μA Fill in the record book 14. Boiler settings 48 F 15. Final activities 49 F - CLose the boiler door and the control panel - Hand over Remarks Confirming proper start-up Company stamp/signature/date Tab. 27 Start-up report 68 Logamax plus GB162- L.B. 80/100 kW - Subject to modifications resulting from technical improvements!