Download Installation Instructions

Transcript
Installation Instructions 44-2157 (Covers All F150 MLS Complete Kits)
57. With the lower control arms installed, apply Loc‐
tite to, and torque the four crossmember mounting bolts to 222 ft‐lbs. Ensure that the front and rear cross members along with the differential are cen‐
tered in the vehicle chassis. Torque the differential skid plate bolts to 35 ft‐lbs. Tighten sway bar drop hardware to 60 ft‐lbs. 58. Reinstall the driver side and passengers side CV axles. 59. Obtain the appropriate MLS upper strut spacers and match the driver side spacer to the driver side strut and the passenger side spacer to the pas‐
senger strut. Install the spacer to the strut utilizing OE hardware and torque to 30 ft‐lbs. (Fig 46) (Fig 46) 60. Install the strut assemblies in the appropriate sides on the vehicle with the supplied hardware, leave hardware loose at this time. 61. Remove the four hub bolts from the stock steering knuckle and remove the hub from the (Fig 47) knuckle. (Fig 47) In‐
spect the mounting surface of the hub assembly and clean any dirt or corrosion off as necessary. 62. Install the hub into the corresponding new ReadyLIFT steering knuckle (driver #48‐2400 , pas‐
senger #48‐2401) and fasten with the previously removed OE bolts. The ABS wire mounting location will be located at the ‘top’ of the hub. Use Loctite on the bolt threads and torque to 148 ft‐lbs. Revised June‐14 63. Remove the three 6mm bolts mounting the vac‐
uum hub assembly to the inside of the OE knuckle. Transfer the vacuum assembly over to the new knuckle. Make sure the vacuum line attachment port is pointing towards the (Fig 48) top. Attach with the previously removed OE bolts and tighten bolts se‐
curely to about 5‐7 ft‐lbs. (Fig 48, 49) (Fig 49) 64. Install the new knuckle assembly on the lower control arm ball joint and loosely fasten with the original nut. In‐
stall the CV axle shaft in the hub, swing the whole assembly up and attach the lower control arm to the strut with the original hardware. Leave all hardware loose. 65. Attach the upper control arm to the knuckle with the original nut. Torque the upper ball joint to 85 ft‐lbs and the lower ball joint to 111 ft‐lbs. (Fig 50) (Fig 50) 66. Torque the upper strut nuts to 35 ft‐lbs. Do not tighten the lower bolt at this time, it will be tight‐
ened after the vehicle is put back on the ground with the weight of the vehicle on the suspension. 67. Fasten the CV axle shaft to the hub with the original nut. Make sure the vacuum actuator splines are engaged properly on the axle and hub assembly. The hub should have a very minor amount of rota‐
tional play with the CV axle shaft if installed prop‐
erly, torque to 20 ft‐lbs and reinstall the dust cap. www.ReadyLIFT.com - Phone: (800) 549-4620
11