Download WIN-PAK 2, Release 4 User Guide

Transcript
268
WIN-PAK 2.0 User Guide
Select First Shift as the time zone. Output 1 (Door
1) is de-energized outside the selected time zone,
locking the door.
3
Enter a value in the Pulse Time field to set the
amount of time that the output point is energized
when triggered. The field can be set from 0–63
seconds, 0–63 minutes, or 0–63 hours.
4
In the case of output points, Interlocking refers to
linking the changing state of the output point to
either another output point, an input point, or a
group of outputs. Refer to "Enabling Interlocking
for Outputs" section (ahead) for details on setting up
interlocking.
5
Create ADVs as needed for system control. For
example, the output ADV is used on the floor plan
definition to monitor the state [Energized, Deenergized, Trouble] of the output point.
6
On returning to the Outputs window [after creating
an ADV for each output point], click the Next
button to advance to the Panel Configuration Groups window.
Enabling Interlocking for Outputs
1
Highlight an output point; select the Interlocking
check box.
2
Select either the Input (I), Output (O), or Group (G)
radio button to indicate the point type with which to
interlock.
3
Choose the interlocking Point from drop-down list.
NOTE: Only input points, output points or groups that have already
been activated appear on this list. If the required point is not
listed, go to the correct dialog and activate the point, then
return to this window.