Download New Elegance

Transcript
1.Contents.
New Elegance
1. CONTENTS
page
2
2. SPECIFICATIONS
3
2.1.External components
3
2.2. Specifications
3
2.3. Boiler element
4
3. ACCESSORIES
4
4. MACHINE INSTALLATION 5
Installing instructions
5
4.1. Electrical installation
5
4.2. Connection options
6
4.3. Hydraulic installation
6
4.4. Filling up the boiler
7
5. FIRST START UP 8
5.1. First start up
8
5.2. The portafilter set
8
5.3. Coffee machine with built in grinder
9
5.4. Espresso brewing
9
5.5. Heating up liquids
9
5.6. Hot water for infusions
9
6. COFFEE MACHINE WITH BUILT-IN GRINDER
10
6.1. Coffee machine with built in grinder
10
6.2. Previous operations before starting up the coffee grinder
10
6.3. How to obtain a grinded coffee dosage
10
6.4. Adjusting the grinding degree of coffee
11
6.5. Adjusting the grinded coffee quantity per dosis
11
7. CLEANING OF THE ESPRESSO MACHINE
12
7.1. Cleaning of group
12
7.2. Cleaning of gasket and shower
13
7.3. Shower cleaning
13
8. ELECTRONIC CONTROL PANEL 14
8.1. Electronic control panel
14
8.2. Programming dosage of the control panel
15
8.3. Example of 1 short coffee programming
16
8.4. PROGRAMMING THE DOSIS FOR HOT WATER FOR INFUSIONS
17
8.5. ALARMS AND WARNINGS OF THE ELECTRONIC CONTROL
17
9. ADITIONAL CAPABILITIES IN MACHINES WITH DISPLAY
18
9.1. ESPRESSO MACHINE STATUS 18
9.2. ACCESS TO ADITIONAL MENUS
19
9.3. CLOCK ADJUST: ADJUSTING HOUR, MINUTES AND DAY
20
9.4. AUTO ON/OFF
20
9.5. DAY OFF ADJUSTMENT
21
10. POSSIBLE ANOMALIES
22
10.1. FAILURES PRODUCED BY LIME
22
10.2. PROBLEMS DUE TO GRIND SETTING
22
10.3. RECOMMENDATIONS
22
10.4. CAUTIONS
22
2.