Download C 500
Transcript
C 500 Basic checks o Check the dry nitrogen supply pressure It must be 1.5 bar + 0.3 bar. You have to read the following values on the manometers of the utility control panel: Dry N2 supply inlet pressure = 0.8 bar. N2 sweeping of turbo pump in process = 0.2 bar Utility control panel If readings are not correct: check the dry nitrogen supply. It must deliver at least 1.5 bar. check that the dry nitrogen valve is open, and if not, open it. ams01402.doc - Edition 02 – May, 06 Dry nitrogen valve Utility connection panel Alcatel Vacuum Technology France – AMS 200 User’s manual 2/6