Download Technical Manual
Transcript
STANDARD CONTROL COMBIMIX PROBLEM SOLVING IMPORTANT NOTE: Before wiring anything switch off mains power supply at common spur. YES System Not Operating NO PROCEED Connect mains supply from a common spur to the Live & Neutral ‘240v POWER’ terminals in wiring centre(s) and Earth to the main Earth terminal Is there a 240v AC mains power supply to the wiring centre? Is the programmable Clockstat (TP5000) connected to the wiring centre? Set temperature on Clockstat to an artificial high. e.g. 30°C Is the Clockstat switched on, is there a flame symbol in the top right hand corner of the display? Connect Clockstat across ‘TIME’ terminals in wiring centre. TIME 1 to Clockstat B TIME 0 to Clockstat C Set temperature on Roomstat(s) to an artificial high. e.g. 30°C Are one or more of the roomstats calling for heat, is there a heat symbol in the bottom right hand corner of the display? Loop ‘TIME’ terminals between other wiring centres in the system Check wiring of roomstats and actuators to wiring centre. Ensure roomstats are connected to corresponding terminals for actuators Are the corresponding actuators opening at the manifold? This will take 3 -4 minutes Is underfloor heating pump (P2) working? Is the boiler and boiler pump running? Check link has been made between ‘240v POWER’ terminal L and ‘PUMP’ terminal 0 Check connections between pump and wiring centre. Feed from mains neutral to N terminal at pump and ‘PUMP’ terminal 1 to L terminal at pump Check connections between ‘DEM’ terminal 1 and boiler start terminal Check link has been made between ‘240v POWER’ terminal L and ‘DEM’ terminal 0 Are flow rates registering on flow meter(s) at manifold? Link in cable from ‘DEM’ terminal of other wiring centres in system Check the flow meter balancing valves are open on the flow manifold Adjust flow rates via balancing valves on flow manifold, to specified rates from CAD for each group Set roomstats to desired temperatures for each room. Leave Clockstat on at an artificially high temperature Let system run for 4-5 hours then check room temperatures. Ajust flow temp. on thermostatic head at manifold if desired room temp. is not reached If system is still not operating correctly please contact technical helpline The boxes marked in RED are only relevant to systems using more than one wiring centre. STANDARD CONTROL PROBLEM SOLVING 30