STANDARD CONTROL COMBIMIX PROBLEM SOLVING
IMPORTANT NOTE: Before wiring anything switch off mains power supply at common spur.
YES
System Not Operating
NO
PROCEED
Connect mains supply from
a common spur to the Live
& Neutral ‘240v POWER’
terminals in wiring centre(s)
and Earth to the main Earth
terminal
Is there a 240v AC
mains power supply to
the wiring centre?
Is the programmable
Clockstat (TP5000)
connected to the
wiring centre?
Set temperature on
Clockstat to an artificial
high. e.g. 30°C
Is the Clockstat
switched on, is there a
flame symbol in the top
right hand corner of the
display?
Connect Clockstat
across ‘TIME’ terminals
in wiring centre.
TIME 1 to Clockstat B
TIME 0 to Clockstat C
Set temperature on
Roomstat(s) to an
artificial high. e.g. 30°C
Are one or more of the
roomstats calling for heat,
is there a heat symbol in the
bottom right hand corner of
the display?
Loop ‘TIME’ terminals
between other wiring
centres in the system
Check wiring of roomstats
and actuators to wiring
centre. Ensure roomstats
are connected to
corresponding terminals for
actuators
Are the corresponding
actuators opening at the
manifold? This will take 3 -4
minutes
Is underfloor heating pump
(P2) working?
Is the boiler and boiler
pump running?
Check link has been made
between ‘240v POWER’
terminal L and ‘PUMP’
terminal 0
Check connections between
pump and wiring centre.
Feed from mains neutral
to N terminal at pump and
‘PUMP’ terminal 1 to L
terminal at pump
Check connections between ‘DEM’ terminal 1
and boiler start terminal
Check link has been made
between ‘240v POWER’
terminal L and ‘DEM’
terminal 0
Are flow rates registering on
flow meter(s) at manifold?
Link in cable from ‘DEM’
terminal of other wiring
centres in system
Check the flow meter
balancing valves are open
on the flow manifold
Adjust flow rates via
balancing valves on flow
manifold, to specified rates
from CAD for each group
Set roomstats to desired
temperatures for each
room. Leave Clockstat
on at an artificially high
temperature
Let system run for 4-5
hours then check room
temperatures. Ajust flow
temp. on thermostatic head
at manifold if desired room
temp. is not reached
If system is still not
operating correctly please
contact technical helpline
The boxes marked in RED are only relevant to systems using more than one wiring centre.
STANDARD CONTROL PROBLEM SOLVING