MOS/Skill Level Tasks
Performance Measures
GO
NO-GO
22. Released all gas from the regulator.
——
——
23. Closed the regulator control.
——
——
24. Removed the regulator from the gas cylinder.
——
——
25. Replaced the valve protector cap(s).
——
——
26. Returned and secured the gas cylinder to its storage area.
——
——
27. Read and followed the operating instructions in given reference(s).
——
——
28. Visually inspected the pressure standards and test instrument(s) (TI) for any
physical defects.
——
——
29. Observed all safety precautions, warnings, hazards, and notes.
——
——
30. Turned on DPI 145/R pneumatic pressure standard (PPS) using front panel
power switch.
——
——
31. Ensured that appropriate unit of measure is displayed (F1 Key).
——
——
32. Operated PDS and PPS to perform high pressure operation (300 - 2200 psi).
——
——
33. Operated PDS and PPS to perform low pressure operation (0 - 299 psi).
——
——
34. Replaced all protective covers.
——
——
35. Operated Reference Pressure Monitor RPM-3 to perform hydraulic pressure
operation.
——
——
36. Cleaned all equipment.
——
——
37. Replaced all protective covers.
——
——
38. Stowed all equipment.
——
——
39. Visually inspected the pressure and vacuum gauges for any physical defects.
——
——
40. Identified correct calibration procedure(s) to be used in accordance with TB 43180.
——
——
41. Updated calibration procedure(s) as necessary in accordance with USATA
Calibration Procedure Master List.
——
——
42. Observed all safety precautions, warnings, hazards, and notes.
——
——
43. Calibrated hydraulic gauges in accordance with TB 9-6685-319-24, Section III.
——
——
44. Calibrated pneumatic gauges in accordance with TB 9-6685-319-24, Section IV.
——
——
45. Calibrated vacuum gauges in accordance with TB 9-6685-327-35, Section III.
——
——
46. Replaced protective covers on gauges if necessary.
——
——
47. Disconnected and properly maintained equipment.
——
——
Evaluation Guidance: Use the applicable technical bulletin as a guide to verify that all steps in the
calibration process are performed in accordance with the proper calibration procedure.