Download Overview - Octopart
Transcript
EZ-SCREEN LP Instruction Manual 3.4 Light Screen Initial Checkout The initial checkout procedure must be performed by a Qualified Person (see Section 4.1). It must be performed only after configuring the System and after connecting the emitter and receiver per Section 3.3. Configuring the System for Initial Checkout Verify that the emitter and receiver both are set to the factory defaults for initial checkout and optical alignment. (Receiver factory defaults are for trip output, 2-channel EDM, reduced resolution OFF, aux output, inverted display OFF, and scan code 1. Emitter factory defaults are for reset, fault output OFF, inverted display OFF, and Scan Code 1. See Figure 4-1.) Initial checkout is performed on two occasions: • To ensure proper installation when the System is first installed, and • To ensure proper System function whenever any maintenance or modification is performed on the System or on the machinery being guarded by the System. (See Section 6.1 for a schedule of required checkouts.) For the initial checkout, the EZ-SCREEN LP System must be checked without power being available to the guarded machine. Final interface connections to the guarded machine cannot take place until the light screen system has been checked out. This may require lockout/tagout procedures (refer to OSHA1910.147, ANSI Z244-1, or the appropriate standard for controlling hazardous energy). These connections will be made after the initial checkout procedure has been successfully completed. Verify that: • Power has been removed from (or is not available to) the guarded machine, its controls or actuators; and • The machine control circuit or the interface module is not connected to the OSSD outputs at this time (permanent connections will be made later); and • EDM is configured for no monitoring, per Section 3.5.3. 3.4.1 Initial Power-Up and Optical Alignment 1. Inspect nearby areas for reflective surfaces, including work pieces and the guarded machine. Reflective surfaces may cause light beams to reflect around a person in the light screen, preventing the person from being detected and not stopping the machine motion. See Section 3.1.6. E liminate the reflective surfaces as possible by relocating them, painting, masking or roughening them. Remaining problem reflections will become apparent during step 5. Installation and Overview Alignment 2. Verify that power is removed from the EZ-SCREEN LP System and from the guarded machine and that the OSSD safety outputs are not connected. Remove all obstructions from the light screen. Leaving power to the guarded machine OFF, make power and earth ground connections on both the emitter and receiver cables (see Figures 3-23 to 3-26) and then power up the EZ-SCREEN LP System (only). V erify that input power is present to both emitter and receiver. At least one indicator on both emitter and receiver should be ON and the start-up sequence should cycle. 3. Observe both the emitter and the receiver Status indicators and the receiver Zone indicators to determine light screen alignment status: • An Emitter Lockout condition – the emitter Status indicator single-flashing Red; the receiver Status indicator ON Red, 7-segment display reads “CH1”. Proceed to Section 5 for diagnostic information. • A Receiver Lockout condition – the emitter Status indicator ON Green; the receiver Status indicator single-flashing Red, Zone and Reset indicators OFF. Proceed to Section 5 for diagnostic information. • Normal operating mode (emitter) – the Status indicator ON Green. • A Latch condition (receiver), all optical beams clear – the receiver Status indicator ON Red and the Reset indicator double-flashing Yellow; Zone indicators ON Green. When the receiver is configured for Latch Output, the outputs are ON only when all beams are clear and after a manual reset (see Section 1.4.8). If a reset routine can cause a Clear (Run) condition, optimize the alignment as described in step 4. If a Clear (Run) condition can not be achieved, see “Blocked condition” below. • A Clear (Run) condition (receiver) – the Status indicator ON Green (or flashing Green if reduced resolution is enabled), and the Reset indicator ON Yellow. All Zone indicators ON Green. • A Blocked condition (receiver) – the Status indicator ON Red, the yellow Reset indicator ON, and one or more Zone indicator(s) ON Red, identifying the location of the blocked beams, and the number of blocked beams will be displayed. Proceed to step #4. NOTE: If beam 1 is blocked, Zone indicator 1 will be Red and all others OFF. (Beam 1 provides the synchronization signal.) NOTE: If the emitter Test input is open, the receiver’s 7-segment Display will indicate the total number of beams in the system (minus one) and all Zone indicators will be Red (except for 14-beam systems, where Zone 1 indicator will be Green). Banner Engineering Corp. • Minneapolis, U.S.A. www.bannerengineering.com • Tel: 763.544.3164 P/N 140044 P/N 133487 rev. A 31