Commissioning Commissioning/Protection Test Putting into operation/Protection test must be carried out by authorized and qualified personnel. Before the device is put into operation the related documentation has to be read and understood. With any test of the protection functions the following has to be checked: Is activation/tripping saved in the event recorder? Is tripping saved in the fault recorder? Is tripping saved in the disturbance recorder? Are all signals/messages correctly generated? Do all general parameterized blocking functions work properly? Do all temporary parameterized (via DI) blocking functions work properly? To enable checks on all LEDs and relay functions, these have to be provided with the relevant alarm and tripping functions of the respective protection functions/elements. This has to be tested in practical operation. • • • • • • • Check of all temporary blockings (via digital inputs): • In order to avoid malfunctions, all blockings related to tripping/non-tripping of protection function have to be tested. The test can be very complex and should therefore be performed by the same people who set up the protection concept. Check of all general trip blockings: • All general trip blockings have to be tested. Prior to the initial operation of the protection device all tripping times and values shown in the adjustment list have to be confirmed by a secondary test Any description of functions, parameters, inputs or outputs that does not match the device in hand, can be ignored. Page 484 EN MRA4 04/09
Related documents
Instruction Manual
MRA4 HighPROTEC - DSF Technologies
Eton 4000 Plus Instruction manual
SonicWALL TZ 170 10 Node with Comprehensive Gateway Security
GCP-30 Series Genset Control
SonicWALL TZ 170 10 Node
USER`S MANUAL HOOK 3
FAMICO e-Platform User Manual for Counselors
INGEPAC PL70FV User Manual
User`s Manual - EV Charger News
Powerbook 2005
USER`S MANUAL TAKOO 3