Download Black Box CSU/DSU Specifications

Transcript
CHAPTER 12: Testing and Troubleshooting
Test Purpose
A DTE with TP test verifies the internal transmit and receive circuitry of the
CSU/DSU MS DBU.
Interpreting Test Results
If the unit is functioning properly, the CSU/DSU MS DBU displays:
DTE WITH TP
TST ERR=XX
The first line of the display indicates the type of test being performed, while the
second line of the display indicates the number of errors accumulated by the test
pattern detector.
If errors occur during this test, the test error count can be reset to zero by pressing
1. To verify proper operation of this test, single bit errors can be injected into the
transmitted test pattern by pressing 2. These errors appear on the TEST ERR
display.
12.3.5 TEST PATTERN
The Test Pattern option converts the local CSU/DSU MS DBU into a BERT tester
for the purpose of testing the DDS circuit. If this test is used, the remote DSU/CSU
must be in loopback or transmitting a test pattern. Figure 12-9 illustrates the data
paths for this mode.
LOCAL
DSU/CSU
Error
Inject
REMOTE
DSU/CSU
Test Pattern
Generator
Error
Inject
DTE Tx
NET Tx
DTE Rx
NET Rx
Error
Clear
Test Pattern
Detector
TELCO
Test Pattern
Generator
NET Tx
DTE Tx
NET Rx
DTE Rx
Error
Clear
Test Pattern
Detector
Figure 12-9. Test Pattern Only.
81