Download Argo ADS Series Specifications
Transcript
04-396 Inverter-W_a-p50 ARGO 12/21/04 9:38 AM Page 47 ■ 4-Way Air Discharge Semi-Concealed Type (ASS Type) Note: For DC Fan Tap Change Procedure for 4-Way Cassette, see page 139. 3-13. Preparation for Suspending This unit uses a drain pump. Use a carpenter’s level to check that the unit is level. Hole-in-anchor Hole-in-plug 3-14. Suspending the Indoor Unit (1) Fix the suspension bolts securely in the ceiling using the method shown in the diagrams (Figs. 348 and 3-49), by attaching them to the ceiling support structure, or by any other method that ensures that the unit will be securely and safely suspended. Concrete Insert Suspension bolt (M10 or 3/8") (field supply) (2) Follow Fig. 3-49 and Table 3-3 to make the holes in the ceiling. Fig. 3-48 ASS Table 3-3 B C D 788 723 885 885 (3) Determine the pitch of the suspension bolts using the supplied full-scale installation diagram. The diagram and table (Fig. 3-50 and Table 3-4) show the relationship between the positions of the suspension fitting, unit, and panel. Table 3-4 Unit: mm A B C D E 28, 36, 56, 73 113 173 256 210 88 106, 140 113 173 319 210 88 Drain outlet (other side) (VP25) C (ceiling opening dimension) Fig. 3-49 Refrigerant tubing joint (narrow side) Refrigerant tubing joint (wide side) C Suspension lug B D E Type A (suspension bolt pitch) A Length Fig. 3-50 47 35 28, 36, 56, 73, 106, 140 A D (ceiling opening dimension) Length B (suspension bolt pitch) Type Unit: mm