Download Viking ESFR Technical data

Transcript
Page II
March 7, 2008
TECHNICAL DATA
ESFR PRE-PRIMED SINGLE
INTERLOCK PREACTION
COLD STORAGE SYSTEM
The Viking Corporation, 210 N Industrial Park Road, Hastings MI 49058
Telephone: 269-945-9501 Technical Services 877-384-5464 Fax: 269-945-4495 Email: techsvcs@vikingcorp.com
Table of Contents
I. SYSTEM DESCRIPTION
1. System Considerations
2. System Makeup
II. SYSTEM DESIGN
1. Hydraulic Calculations
2. Determining the Required Volume of Propylene Glycol
3. Typical Storage Arrangements
4. Designing the Detection System
III. INSTALLATION AND COMPONENT FUNCTIONS
1. Water Supply Control Valve
2. Grooved Couplings
3. Deluge Valve with Conventional Trim
A. Water Flow Pressure Switches (PS-10)
4. Electric Release Trim
5. Easy Riser® Check Valve with Cold Storage Trim
A. Cold Storage Trim with Automatic Pressure Control System
1. Supervisory Pressure Switch (PS-40)
6. Digital Pressure Switch
A. Description
B. Technical Data
C. Operating Modes
D. Installation
1. Electrical Connection
E. Inspections, Tests and Maintenance
7. Propylene Glycol Solution Reclaim Tank
8. Bypass Easy Riser® Check Valve with Bypass Trim
9. Downstream System Isolation Valve
10. CS-1 Tank & Pump Unit
A. Description
B. Technical Data
C. Installation
1. Handling
2. Location
3. Piping and Connections
4. Electrical Connections
5. Start Up
Page
4
4
4
6
6
17
18
26
27
28
28
29
31
32
33
34
34
35
35
35
37
37
37
38
39
40
41
42
42
44
44
44
44
44
45
45