Download Emerson ControlWave GFC Instruction manual
Transcript
ControlWave Gas Flow Computer (GFC Plus) Instruction Manual (CI-ControlWave GFC Plus) o 2-to-3 Installed = 6/24V power fail trip point W12: COM3 configuration selection: o 1-to-2 Installed = COM3 is RS-232 o 2-to-3 Installed = COM3 is RS-485 W13: COM3 configuration selection: o 1-to-2 Installed = COM3 is RS-232 o 2-to-3 Installed = COM3 is RS-485 W14: COM3 configuration selection: o 1-to-2 Installed = COM3 is RS-232 o 2-to-3 Installed = COM3 is RS-485 W15: COM3 configuration selection: o 1-to-2 Installed = COM3 is RS-232 o 2-to-3 Installed = COM3 is RS-485 W16: COM3 configuration selection: o 1-to-2 Installed = COM3 is RS-232 o 2-to-3 Installed = COM3 is RS-485 W17: Input power selection (controls solar power shunt regulation) Not applicable for +24Vdc CPUs: o 1-to-2 Installed = 6V power o 2-to-3 Installed = 12V power W18: COM1 connector selection: o 1-to-2 Installed = connector J4 (D connector) is active o 2-to-3 Installed = alternate connector J11 is active 2.3.3 General Wiring Guidelines 2-18 ControlWave GFC Plus terminal blocks use compression-type terminals that accommodate up to #16 AWG wire. When making a connection, insert the bare end of the wire (approx ¼” max) into the clamp adjacent to the screw and secure the screw. To prevent shorts, ensure that no bare wire is exposed. If using standard wire, tin the bare end with solder to prevent flattening and improve conductivity. Allow some slack in the wire while making terminal connections. Slack makes the wires more manageable and helps minimize mechanical strain on the terminal blocks. Installation Revised Feb-2013