Download Selectronic SP Pro Technical data
Transcript
Data sheet Powador 10.0 TL3 12.0 TL3 14.0 TL3 18.0 TL3 NEW Data sheet Powador 10.0 TL3 12.0 TL3 14.0 TL3 18.0 TL3 NEW Powador 10.0 TL3 | 12.0 TL3 14.0 TL3 | 18.0 TL3 The power plants of the future. The transformerless three-phase inverters Powador 10.0 TL3 to 18.0 TL3. 3D efficiency diagram for Powador 14.0 TL3 95 97 700 650 UDC[V] Multilingual menu 97 600 550 95 Graphical display 97 97 500 93 450 97 96 97 94 400 Integrated web server 350 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 PAC [W] USB connection for updates Efficiency characteristic curve for Powador 14.0 TL3 100 η [%] Conforms to the German Medium and Low Voltage Directives 99 755 V 98 97 96 95 755 V 94 η 93 η 92 η 91 90 0 2000 4000 6000 PAC [W] 8000 10000 Max Euro CEC = 98.0 = 97.6 = 97.8 12000 Subject to technical changes. Errors and omissions excepted. Integrated web server Two MPP trackers, symmetrical and asymmetrical loading possible 98 750 96 43 98.0 % efficiency 800 The power plants of the future. Graphical display EN 5000064-05-120602 strings can be connected per MPP controller, i.e. 4 strings for each unit. 94 ware can be downloaded free of charge from the download area of www.kaconewenergy.de/service. The yield data can be called from the web server or via USB The rated input voltage range of 350 to for evaluation. The integrated data log800 V is particularly broad (420 to 800 V ger can also be connected directly to the for the Powador 18.0 TL3). The inverters Powador web internet portal for professwitch to the grid from 250 V, and, when The transformerless three-phase inverters Powador 10.0 TL3 to 18.0 TL3. sional evaluation and visualisation of the in operation, they still feed in at 200 V. They operate using two separate MPP inverter data. This means that solar yields are optimum trackers that can handle both symmefor comparatively small areas such as trical and asymmetrical loads to allow ware can be downloaded free of charge strings can be connected per MPP conPhotovoltaic systems of up to several A number of country-specific default dormers or carports but they also opefor optimum adjustment. Each tracker from the download area of www.kacotroller, i.e. 4 strings for each unit. hundred kilowatts can be designed exsettings are programmed into the inverrate for more of the day. The peak efficiis able to process virtually all of the AC newenergy.de/service. The yield data can tremely flexibly in small, highly efficient ters. These are easy to select during onency is 98 % and the European efficiency output. This allows for all typical requibe called from the web server or via USB The rated input voltage range of 350 to units with the transformerless threesite installation. The interface language is also above average. The compact derements of complex designs to be fulfilfor evaluation. The integrated data log800 V is particularly broad (420 to 800 V phase inverters Powador 10.0 TL3 to can be selected separately. The inverters sign weighing only 40 kg combined with led; on the one hand, for example, full ger can also be connected directly to the for the Powador 18.0 TL3). The inverters 18.0 TL3. conform to the German Medium and the DC connection via solar connectors configuration of an east/west-facing roof Powador web internet portal for professwitch to the grid from 250 V, and, when Powador Low Voltage Directives and support the makes installation very easy and econo(symmetrical load) or, on the other hand, sional evaluation and visualisation of the in operation, they still feed in at 200 V. They operate using two separate MPP functions of the 10.0 Powador-protect for grid mical. the regular configuration of a southTL3 | 12.0 TL3 inverter data. This means that solar yields are optimum trackers that can handle both symmeand plant protection and also| power mafacing roof without having to dispense for comparatively small areas such as trical and asymmetrical loads to allow 14.0 TL3 18.0 TL3 nagement in accordance with the GerIt is easy to achieve perfect communiwith the solar yield of a dormer (asymA number of country-specific default dormers or carports but they also opefor optimum adjustment. Each tracker man EEG 2012. cation with these units. They are fitted metrical load). The MPP trackers can settings are programmed into the inverrate for more of the day. The peak efficiis able to process virtually all of the AC with an integrated data logger with web also be connected in parallel: installation ters. These are easy to select during onency is 98 % and the European efficiency output. This allows for all typical requiThe Powador 18.0 TL3 is available from server, a graphical display for showing costs less (you do not need an additional site installation. The interface language is also above average. The compact derements of complex designs to be fulfil98.0 % efficiency July 2012. operating data and a USB port for instalexternal disconnector) when strings need can be selected separately. The inverters sign weighing only 40 kg combined with led; on the one hand, for example, full ling firmware updates. The current softto be combined before the inverter. Two conform to the German Medium and the DC connection via solar connectors configuration of an east/west-facing roof Low Voltage Directives and support the makes installation very easy and econo(symmetrical load) or, on the other hand, Two MPP symmetrical functions of thetrackers, Powador-protect for grid mical. the regular configuration of a southand asymmetrical loading possible and plant protection and also power mafacing roof without having to dispense nagement in accordance with the GerIt is easy to achieve perfect communiwith the solar yield of a dormer (asymman EEG 2012. cation with these units. They are fitted metrical load). The MPP trackers can with an integrated data logger with web also be connected in parallel: installation Multilingual menu The Powador 18.0 TL3 is available from server, a graphical display for showing costs less (you do not need an additional July 2012. operating data and a USB port for instalexternal disconnector) when strings need ling firmware updates. The current softto be combined before the inverter. Two Photovoltaic systems of up to several hundred kilowatts can be designed extremely flexibly in small, highly efficient units with the transformerless threephase inverters Powador 10.0 TL3 to 18.0 TL3. Graphical Display of efficiency www.kaco-newenergy.de