Download Model 956
Transcript
INSTALLER GUIDE 8. PREPARING APPLIANCE FOR INSTALLATION 8.1 Appliance preparation. 1. Remove any transit tape and packing and inspect for any evidence of mishandling which might affect the performance of the fire. Each unit is flame tested before it leaves the factory and as a result there may be slight discolouration around the burner ports. 2. Detach the burner unit from the hotbox by removing two screws (See figure 8). Lift the burner unit clear. Figure 8. Burner attachment points IMPORTANT Before continuing with the installation of this gas fire the aeration setting on the burner must be checked. The aeration is factory set, but will require adjustment (See section 15.1). 3. It is important that the grommet ‘H’ supplied in the loose parts pack is fitted to the hole in the rear of the hotbox. 8.2 Fitting the foam seal (All models). There is a length of self adhesive foam seal supplied with the fire. This will need to be fitted to the outer rear edges of the side and top flanges of the hotbox. Cut the foam seal to the required length. Be careful not to stretch the seal when measuring. Remove the protective backing from the foam seal and fit this to the rear of the hotbox flange (See figure 9). 8.3 The flue restrictor. This appliance is supplied with a flue restrictor for use where the flue draught is excessive. The restrictor must not be fitted where a precast flue or a 125mm flue liner is used. For flue liners greater than 125mm and all other installations the restrictor should be fitted. There may however, be certain exceptional Figure 9. Fitting the foam seal circumstances where fitting the restrictor causes the fire to fail the spillage test. In such cases the restrictor will have to be removed. © Baxi Heating U.K. Limited 2007. Page 21