Download CDU - Rack Mount Installation Guide

Transcript
Cooling Distribution Unit Module
CONTENTS
Section 1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
SAFETY INSTRUCTIONS
General Notice
Installation/Handling
Application
Warranty
Electrical connection
Maintenance
Service parts
Codes of Practice
Waste disposal
Documentation
5
6
6
6
6
6
6
6
6
6
Section 2
2.1
INTRODUCTION
General
7
Section 3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
TECHNICAL DATA
Handling
Pipe Connections
Electrical Connection
Volume Capacity
Noise
Secondary Circuit
Primary Circuit
9
9
9
9
9
9
11
Section 4
4.1
4.2
4.3
4.4
INSTALLATION
Mechanical
Electrical
Hydraulic
Heat Transfer Fluids
13
13
14
14
Section 5
5.1
5.2
5.3
5.4
COMMISSIONING
Pre-Commissioning Checks
Chilled Water
Controller Setup
System Filling
15
15
15
15
Section 6
6.1
6.2
6.3
6.4
6.5
OPERATION
Controller Introduction
Controller Menu Summary
Automatic Operation
Acknowledgement of Alarm Messages
Control Loop set-Up
17
19
26
28
28
Section 7
7.1
7.2
7.3
7.4
7.5
PREVENTATIVE MAINTEANCE
General
Every 3 Months
Every 6 Months
Every 12 Months
Module Drainage
29
29
29
29
29
Section 8
8.1
8.2
TROUBLE SHOOTING
Summary of Alarm Messages
Temperature Sensor Chart
31
32
Section 9
SPARE PARTS LIST
33
Section 10
10.1
10.2
DIAGRAMS
Wiring Diagram
Pipe Schematic
38
40
Section 11
WARRANTY & SUPPORT
41
CDU Module Installation Guide
Page 3