Download Sun Fire E6900/E4900 Systems Installation Guide
Transcript
Contents Preface 1. 2. xli Preparing for Installation 1–1 1.1 Verifying the Electrical Circuits 1–1 1.2 Verifying the Air Conditioning 1–2 1.3 Verifying the Floor Area 1–3 Installing the Sun Fire E6900 System 2–1 2.1 Tools 2–1 2.2 Moving and Securing the Sun Fire E6900 System 2.2.1 Adjusting the Leveling Pads 2.2.2 Securing the Cabinet to the Floor 2–5 2.2.3 Shipping and Storing the System 2–7 2–2 2–5 2.3 Connecting Power Cables to the Sun Fire E6900 System 2.4 Connecting the I/O Assemblies 2.5 Connecting the Administrative Console 2–8 2–11 2–11 2.5.1 Connecting the ASCII terminal 2–12 2.5.2 Connecting the Administrative Console 2.6 Powering On the Sun Fire E6900 System 2–14 2.7 Powering Off the Sun Fire E6900 System 2–16 2–12 iii