Download USER MANUAL
Transcript
Content I_ Introduction 3 II_ Preparation and Assembly 5 II_A. Setting up the Container II_B. Setting up the Percolation System II_C. Setting up the Gas Tapping System 5 7 10 III_ Loading 13 IV_ Reaction Observation, Treatment and Troubleshooting 17 IV_A. Percolation System Initial State Percolation System Float the Pump with Water Running the Percolation System the first Time Percolat Sample * (twice a day) Adding Liquids during the Reaction Exchange the Filter * (app. every seven days) IV_B. Gas Tapping Initial State Gas Tapping Fill Flash Back Arrestor Empty Condensate Trap * (every day if gas is produced) Gas Measure * (twice a day) Gas Meter * (twice a day) IV_C. Errors & Troubleshooting Inconsistent Percolation Percolation is not starting Pump is not starting PH-Value too low (< 6) The Pump is clogged 17 18 18 19 20 21 22 23 23 24 24 24 26 27 27 27 27 28 29 V_ Unloading 30 VI_ References 33