Download OPERATING INSTRUCTIONS

Transcript
MANUAL
BIOMASS HEATING
INSTALLATION COMPACTC0 / C1 / C1L
TABLE OF CONTENTS
1.
Description of the installation
1.1
1.2
1.3
1.5
1.6
1.7
1.8
1.9
1.10
Function
Installations C0 / C1/C1L
Setting up the installation “Compactanlage” C0 / C1 / C1L
Heating-sided installation of the installations “Compactanlagen” C0 / C1 / C1L
Stoker unit with fire prevention shutter
Ashes slide
Section of Stoker unit installation “Compactanlage” C0 / C1 / C1L
Feeding conveyor
Kettle cleaning and servicing of the installation
2.
Assembly tips of the control AM I
3.
Safety-technical facilities
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
Automatic return
Safety shutter
Sprinkler system (back fire-extinguishing)
Safety thermostat STB
Door switch of boiler’s door
Safety switch (overfilling)
Main switch
Ashes thermostat
Low-pressure supervision
Safety temperature device (overheating)
4.
Combustion course
4.1
4.2
Combustion control
Automatic ignition
5.
Putting into operation of the heating installation
5.1.
5.2.
5.3.
Before first putting into operation
To pay attention for operation
To heat up the installation
:
A.P. Bioenergietechnik GmbH
Traeglhof 2, 92242 Hirschau
Seite:
BABA- 2