Download A User Guide to iSBEM: (3) EPC Generation - UK
Transcript
contains residential accommodation above a non-domestic space (e.g., a shop or a pub) provided that the residential space can only be accessed from within the non-domestic space, i.e., the residential part is not designed or altered for use as a separate independent dwelling. In addition to common circulation areas of apartment buildings containing self-contained flats, these are the only cases where SBEM can be used to model domestic areas. For more information on the appropriate software tools to use for modelling your building, please refer to DCLG’s publication: “Improving the energy efficiency of our buildings: A guide to energy performance certificates for the construction, sale, and let of non-dwellings” which can be accessed from DCLG’s website at https://www.gov.uk/government/publications/energyperformance-certificates-for-the-construction-sale-and-let-of-non-dwellings--2. Infiltration 2. Air permeability at 50pa, in m3/h.m2 - If the purpose of analysis option that has been selected in the General form > General Information tab > Project Details sub-tab is EPC generation, then iSBEM’s default value for air permeability will be 25 m3/h.m2. However, the user can over-write the default value by manually entering an alternative value.NB: For EPCs of existing buildings, note that the air permeability convention given in section 3.4.1: Project tab should apply. Figure 12 shows a zone being defined. Notes entered at the user’s discretion about the zone. A description of the selected activity area as it appears in the NCM Activity database. Selected building type for this zone. Selected activity type for this zone. Figure 12: A zone being defined in the General sub-tab of the Zones tab in the Geometry form Thermal Bridge sub-tab: Guidance on input in this sub-tab is the same as that provided in the User Guide volume How “ to use iSBEM: Compliance Assessment - UK”. Envelope Summary sub-tab: Guidance on this sub-tab is the same as that provided in the User Guide volume H “ ow to use iSBEM: Compliance Assessment - UK”. 27 iSBEM version 5.2.d – EPC Generation - UK 31Jul14