Download Local Authority Basic Carbon Tool user guide
Transcript
DfT LA Basic Carbon Tool – User Guide Worked example B ________________________________________________________________________________________________________ 1.25 Freight servicing plans Time period The intervention affects peak and offpeak time periods. But, unusually, there is no need to create two scenarios as there is a 100% shift i.e. Pre-intervention – all journeys in peak time at a specific speed. Post-intervention – all journeys in offpeak time at a different speed. Affected modes All freight affected, so LGV and HGV checkboxes selected. Vehicle mix ________________________________________________________________________________________________________ Default national mix used from 2011. In House Analytical Consultancy v