Download Operating Instructions - SEW
Transcript
Mechanical Installation Installation of secondaries 5.3 5 Installation of secondaries Preparing the secondaries for installation Caution: Do not unpack parts until you are ready for installation. Installation of secondaries Install the first part at one end of the travel section and work your way down in one direction. The orientation of the first part can be random. The adjoining part will have the same orientation. The north [1] pole is marked on the secondaries (Æ see figure below). You can combine secondaries of different lengths. [1] 61248AXX [1] North pole Move primary over secondaries by hand prior to startup of drive to check for unhindered operation. Use non-magnetic testing devices, such as feeler gauges made of stainless steel, aluminum, brass or copper sheets if you are planning to check the visible air gap. Induced voltages of up to 500 V can be generated by movement of the primary (generator principle) even if the motor is not connected. Only remove the protection cap on the power plug of the primary immediately before connecting the power plug to the power supply. Operating Instructions – SLC Synchronous Linear Motors 21