Download Version its-0.51
Transcript
Figure 9: Cost-table editor allows automatic economy of scale calculations for network. – – – – – quantity is here the length in meter of the total network. Estim. extra costs per year = All annual operating and maintenance costs which are not proportional to the track length (control, cleaning, painting, repair). This cost item can be edited in a quantity/cost table by pressing the Edit... button. The quantity is here the number of this type of track element in the network. Estim. costs per meter per year= All annual operating and maintenance costs proportional to the track length (cleaning, painting, repair). This cost item can be edited in a quantity/cost table by pressing the Edit... button. The quantity is here the length in meter of the total network. Estim. initial costs = Estim. initial extra costs+Estim. initial costs per meter × length of track-element. This cost item is a function of other costs and cannot be edited. Estim. costs per year = Estim. extra costs per year+Estim. costs per meter per year × length of track-element. This cost item is a function of other costs and cannot be edited. The life time can be changed directly in the text box, but has currently no further use. Press the Apply-button to apply costs to the present track-element or the “Apply costs to all modules of this type”-button to copy the costs to 21