Download User Guide
Transcript
NOTE When opening files in Autodesk Navisworks 2012 that were created inAutodesk Navisworks 2011 or previous, you may find that the Planned and Actual dates have been swapped. Autodesk Navisworks now uses Planned dates by default instead of Actual dates , as is consistent with most planning applications. To switch date sets for affected files, edit the data source (see Edit a Data Source (page 658)), switch the mapping of the Planned and Actual dates in the Field Selector Dialog Box (page 620), then rebuild the task hierarchy (see Build Tasks from Data Sources (page 659)). Supported Scheduling Software Autodesk NavisworksTimeLiner supports a variety of scheduling software. NOTE Some of these may only function if the relevant scheduling software is installed. NOTE Autodesk NavisworksTimeLiner supports multiple sources of external schedules using a COM interface. Anyone can develop support for a new schedule source - the type library that defines the interface is included with TimeLiner. Microsoft Project 2003 This data source requires Microsoft Project 2003™ to be installed. Microsoft Project 2007 This data source requires Microsoft Project 2007™ to be installed. Link to External Project Files | 651
Related documents
User Guide
User Guide
Guia do Usuário
Manuale dell`utente
Manuale dell`utente
ImageUltra Builder versione 2.0: Guida per l`utente
Manuel d`utilisation
Manuel d`utilisation
How to Install Autodesk NavisWorks Manage 2009
Inspur TS860 User Manual
- Autodesk
NavisWorks Roamer - Design Systems & Technologies