Download Installation Manual
Transcript
BWC Tilt-up Tower & BWC XL.1 INSTALLATION MANUAL Table of Contents 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Overview ……………………... Safety ………………………… Cautions and Warnings …….. Components …………………. Anchors and Base …………... Tower Assembly …………….. Initial Tower Raising ………. Tower Lowering ……………... XL.1 Wind Turbine ………….. Final Tower Raising ……….. Miscellaneous Reference Material …………………………... Packing Lists ………………… 1 2 2 2 2 6 10 11 11 15 16 19 1. Overview the guy wires along the tilt-axis will change appreciably between the tilted-up and tilted-down positions. If the anchors are lower than the base the tension in the cable(s) can become excessive. If the anchors are higher than the base the cable(s) can become too loose to provide proper stability of the tower sections. When installing in sloped terrain, the Tilt.Tower should always tilt-down in the upslope direction. After assembly of the tower, wind turbine, and tower wiring on the ground, the tower and turbine are tilted-up to the vertical position using a winch (not supplied) or a vehicle. A winch is preferred because of the greater control they afford. The towers are provided with a lever arm, called a gin-pole, which runs from the base to one of the guy anchors. The gin-pole converts the pulling force on the pull-up rope or cable into a lifting force on the turbine and tower. Without the ginpole it would be virtually impossible to raise the tower. The Tilt.Tower is the factory recommended tower for the Bergey XL.1 turbine because it combines cost-effectiveness and ease of installation. Over the long-term the Tilt.Tower will also reduce “total costs of ownership” by making it easier for owners to inspect, provide preventive maintenance (particularly in corrosive environments), and perform repairs to the XL.1 wind turbine. The Tilt.Tower kit includes all of the components and fasteners required to assemble and ground the tower. The tower can be installed without concrete work in areas with good soil strength and no rocks (that would impede the auger for the guywire anchors). In weak or rocky soils the use of concrete to fix the anchors is required. Proper grounding (or “earthing”) is an important element in protecting the system from lightning damage. As shown in Figure 1, the tower is guyed in four directions. The tower is guyed at vertical intervals of approximately 20 ft (6 meters). The Tilt.Tower is best installed on level ground, but can be installed on slopes or uneven terrain provided that the base and the anchors on the tilt-axis can be kept fairly level. If this is not done, the tension in Figure 1, 24 m (78 ft) Tilt.Tower 2. Safety and Quality Assurance 1