BWC Tilt-up Tower & BWC XL.1
INSTALLATION MANUAL
Table of Contents
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
Overview ……………………...
Safety …………………………
Cautions and Warnings ……..
Components ………………….
Anchors and Base …………...
Tower Assembly ……………..
Initial Tower Raising ……….
Tower Lowering ……………...
XL.1 Wind Turbine …………..
Final Tower Raising ………..
Miscellaneous Reference Material …………………………...
Packing Lists …………………
1
2
2
2
2
6
10
11
11
15
16
19
1. Overview
the guy wires along the tilt-axis will change appreciably between the tilted-up and tilted-down positions. If the anchors are lower than the base the
tension in the cable(s) can become excessive. If
the anchors are higher than the base the cable(s)
can become too loose to provide proper stability
of the tower sections. When installing in sloped
terrain, the Tilt.Tower should always tilt-down in
the upslope direction.
After assembly of the tower, wind turbine, and
tower wiring on the ground, the tower and turbine
are tilted-up to the vertical position using a winch
(not supplied) or a vehicle. A winch is preferred
because of the greater control they afford.
The towers are provided with a lever arm, called a
gin-pole, which runs from the base to one of the
guy anchors. The gin-pole converts the pulling
force on the pull-up rope or cable into a lifting
force on the turbine and tower. Without the ginpole it would be virtually impossible to raise the
tower.
The Tilt.Tower is the factory recommended tower
for the Bergey XL.1 turbine because it combines
cost-effectiveness and ease of installation. Over
the long-term the Tilt.Tower will also reduce “total
costs of ownership” by making it easier for owners
to inspect, provide preventive maintenance (particularly in corrosive environments), and perform
repairs to the XL.1 wind turbine.
The Tilt.Tower kit includes all of the components
and fasteners required to assemble and ground
the tower. The tower can be installed without concrete work in areas with good soil strength and no
rocks (that would impede the auger for the guywire anchors). In weak or rocky soils the use of
concrete to fix the anchors is required. Proper
grounding (or “earthing”) is an important element
in protecting the system from lightning damage.
As shown in Figure 1, the tower is guyed in four
directions. The tower is guyed at vertical intervals
of approximately 20 ft (6 meters). The Tilt.Tower
is best installed on level ground, but can be installed on slopes or uneven terrain provided that
the base and the anchors on the tilt-axis can be
kept fairly level. If this is not done, the tension in
Figure 1, 24 m (78 ft) Tilt.Tower
2. Safety and Quality Assurance
1