Download EAS Resources User Guide
Transcript
Resources Applications Purchaser share in another operator’s market. Application Compulsory Pooling Application for an order specifying that all tracts within the drilling spacing unit be operated as a unit to permit the drilling for or the production of oil or gas from the drilling spacing unit. Compulsory Pooling Application CW CBM Deferral Submission to have a deferral granted on attachments meeting CBM control well requirements for exploratory purposes. Only schedule 1 information and some attachments are required. Schedule 1 CW CBM Desorp Application to have a well validated as a CBM Desorption Control Well. CBM Desorption Control Well Application CW CBM P&F Rescind attachments Submission to rescind a CBM pressure and flow Schedule 1 control well. Only schedule 1 information and some attachments are required. CW CBM Press&Flow attachments Application to have a well validated as a CBM Pressure & Flow Control Well. Only schedule 1 information and some attachments are required. CBM Pressure and Flow Control Well Application CW CBM Exception Application to have an exception granted on meeting control well requirements. Control Well Exception Application Schedule 1 CW SHG Deferral Submission to have a deferral granted on meeting shale gas control well requirements for attachments exploratory purposes. Only schedule 1 information and some attachments are required. CW SHG Desorp attachments Submission to have a well validated as a shale gas Desorption Control Well. Only schedule 1 information and some attachments are required. Schedule 1 CW SHG Exception attachments Submission to have a shale gas exception granted on meeting control well requirements. Only schedule 1 information and some attachments are required. Schedule 1 CW SHG P&F Rescind attachments Submission to rescind a shale gas pressure and Schedule 1 flow control well. Only schedule 1 information and some attachments are required. CW SHG Press&Flow attachments Submission to have a well validated as a shale gas Pressure & Flow Control Well. Only schedule 1 information and some attachments are required. Schedule 1 Deviation Survey Deviation Survey waiver. Only schedule 1 attachments information and some attachments are required. Schedule 1 Disp Scheme: Amend Schedule 1 Class II to IV Disposal Scheme: Amend. Only schedule 1 information and some attachments 23