Download Load Cell Troubleshooting
Transcript
body. Repeat the measurement between the same 4 or 6 leads and the resistance between the load cell body and cable shield. Never use a megohmmeter to measure the input or output resistance, TEST #2: INSULATION RESISTANCE exceeds the maximum excitation voltage by far! VPG-08 The insulation resistance is measured between the load cell circuit a VPG Transducers cell from the junction box or indicator and connect all input, output a Input Measure the insulation resistance with a megohmmeter between the the measurement between the same 4 or 6 leads and Load body. Cell Repeat Troubleshooting resistance between the load cell body and cable shield. Never use a megohmmeter to measure the input or output resistan Outputvoltage by far! Test #2: Insulation Resistance exceeds the maximum excitation Σ The insulation resistance is measured between the load cell circuit and element or cable shield. Disconnect the load cell from the junction box or indicator and connect all input, output and sense (if applicable) leads together. Input ANALYSIS Measure the insulation resistance with a megohmmeter between these four or six connected leads and the load cell The insulation resistance of all load cells should be 5000 MΩΩ or more fo body. Repeat the measurement between the same 4 or 6 cable screen and housing to cable screen. leads and the cable shield. Finally measure the insulation Output A lower value indicates electrical leakage, which is usually caused by mo resistance between the load cell body and cable shield. Σ the load cell or cable. Extremely low values (≤ 1k ΩΩ ) indicate a short cir results usually in unstable load cell or scale reading ou Never use a megohmmeter to measure the input or output Electrical leakage resistance, as it normally operates at a voltage which exceeds temperature. the maximum excitation voltage by far! Analysis ANALYSIS load cell or cable. low values (≤1kbeΩ 5000 ) indicate The insulation resistance of all load cells should be The insulation resistance of Extremely all load cells should MΩΩa or mor short circuit rather than moisture ingress. 5000 MΩ or more for bridge circuit to housing, bridge cable screen and housing to cable screen. circuit to cable screen and housing to cable screen. TEST BRIDGE INTEGRITY Electrical leakage results usually which in unstable load cell A lower#3: value indicates electrical leakage, is usually caused b or scale reading output. The stability might vary with A lower value indicates electrical leakage, which is usually the load cell or cable. Extremely low values (≤ 1k ΩΩ ) indicate a shor bridge is verified by measuring the input and output resistan temperature. caused by moisture or chemical contaminations The within the integrity Test #3: Bridge Integrity Electrical leakage usually in unstable cell or scale readin Disconnect the load results cell from the junction box orload measuring device. The input and output resistance is measured with an ohmmeter across eac temperature. the input and output resistance to the original calibration certificate (if av The bridge balance is obtained by comparing the resistance from -output difference between both values should be smaller than, or equal to 1 ΩΩ. The bridge integrity is verified by measuring the input and TEST #3: output resistance as well as the bridge balance. Disconnect the load cell from the junction box or measuring device. BRIDGE INTEGRITY Input Σ resistance from -output to -input, and -output to +input. The difference between both values should be smaller than, or equal to 1Ω. Analysis Input Σ A PPL I CAT I O N N OT E The bridge integrity is verified by measuring the input and output res The input and output resistance is measured with an Disconnect the load cell from the junction box or measuring device. ohmmeter across each pair of input and output leads. Σ input and output resistance is measured with an ohmmeter acros Compare the input and output resistance to theThe original calibration certificate (if available) or to the data sheet and output resistance to the original calibration certificate ( the input specifications. The bridge balance is obtained by comparing the resistance from -ou Output Σ The bridge balance is obtained by comparing the between both values difference should be smaller than, or equal to 1 ANALYSIS result from over-voltage (lightning or welding), physical Changes in bridge resistance or bridge balance are most resistance or bridge balance most excessive often caused by damage from shock, vibration or are fatigue, often caused by a broken or burned wire, anChanges electrical in bridge temperature, or from production inconsistencies. component failure or internal short circuit. This might failure component or internal short circuit. This might result fromΣover-v damage from shock, vibration or fatigue, excessive temperature, or from Output Document Number: 11867 Revision 14-Dec-2011 For technical support, contact in Americas lc.usa@vishaypg.com, in Europe lc.eur@vishaypg.com, in China lc.prc@vishaypg.com, inANALYSIS Taiwan lc.roc@vishaypg.com Σ www.vpgtransducers.com 3