Download C.A 6456
Transcript
Case of an installation with a TN type neutral situation (selective measurement) : => Connect the mains socket (or the 3 separate cables) to the installation to be tested, => Connect a current probe to the terminal and encircle the earth of which the resistance is to be measured: the current used to calculate ZE SEL is that measured by the probe, => Plant the auxiliary rod PE as close as possible to the earth electrode to be measured for a measurement that is as accurate as possible, => Compensate the cables. Note : without the current probe, what is measured is the global earth of the network, which is not very significant. Case of an installation with an IT type neutral situation (not isolated) : Preliminary remarks : - the power supply transformer of the installation must not be completely isolated, but earthed through an impedance, - the installation must also not be in first fault: start by checking the indication of the Permanent Insulation T Tester concerned, - the "grounds to earth" RE and the earth of the power supply transformer must be separate to allow the circulation of the measuring current. => Connect the mains socket (or the 3 separate cables) to the installation to be tested, => Plant the auxiliary rod at a distance > 25 m from the earth electrode. 4.3.3 MEASUREMENT PROCEDURE The instrument first checks the resistance of the rod and measures the voltage between PE and earth, then measures the voltages ULN, ULPE, UNPE. If these values are correct, pressing the TEST key starts the measurement. Remark : to be sure that the auxiliary rod is located in a zone not influence by other earth electrodes, move the rod ( 10% of the distance and repeat the measurement. The result must not change. If it does, move the rod until the earth measurement remains unchanged. 65 www.electronicaembajadores.com