7. Start up
In the delivery condition, the dryer is configured with a purge plug for operating pressure
of 7 to 9 bar. If a different operating pressure is used, the purge plug must be replaced.
The set with the remaining purge plugs is not included and must be ordered separately;
see chapter 10. Each purge plug is equipped with an engraved number for identification.
1.
Determine the appropriate purge plug for the intended operating pressure from the
assignment table in chapter 11.
2.
If necessary, replace the purge plug in the dryer. To replace the purge plug, follow
the work steps from chapters 8.5 and 8.6.
3.
Close valves A, B, C and D.
4.
Switch on compressor.
5.
Open valve A slowly.
Pressure air flows through the
desiccant cartridge and to atmosphere by means of an exhaust
silencer.
6.
Check there are no leaks from the
dryer.