Download ! WARNING - Napoleon

Transcript
2
TABLE OF CONTENTS
EN
1.0
2.0
3.0
INSTALLATION OVERVIEW
INTRODUCTION
3
4
2.1
2.2
2.3
2.4
2.5
2.6
5
5
5
6
7
8
PRE-INSTALLATION PREPARATION
3.1
4.0
5.0
6.0
7.0
8.0
9.0
10.0
DIMENSIONS (COMPLETE WITH FLASHING)
SPECIFICATIONS
GENERAL INSTRUCTIONS
GENERAL INFORMATION
E.P.A. COMPLIANCE
RATING PLATE LOCATION
MINIMUM CLEARANCE TO COMBUSTIBLES
9
9
INSTALLATION
10
4.1
4.2
11
12
TYPICAL EXISTING MASONRY
FACTORY BUILT FIREPLACE
FINISHING
13
5.1
5.2
5.3
5.4
5.5
5.6
13
14
14
15
16
17
SECONDARY AIR TUBES
DOOR INSTALLATION
DOOR HANDLE INSTALLATION
BRICKS AND BAFFLES INSTALLATION
FLASHING INSTALLATION
BLOWER INSTALLATION
OPERATION
18
6.1
6.2
6.3
6.4
6.5
6.5.1
6.5.2
6.6
19
20
20
20
21
21
21
21
OPTIMUM BURN METHOD
AIR CONTROL
FIRE EXTINGUISHERS / SMOKE DETECTORS
FUEL
LIGHTING A FIRE
FLASH FIRE
EXTENDED FIRE
SMOKING
MAINTENANCE
22
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10
7.11
22
22
23
23
24
24
25
25
25
26
27
ASH REMOVAL PROCEDURES
CREOSOTE FORMATION AND REMOVAL
RUNAWAY OR CHIMNEY FIRE
CHIMNEY CLEANING
DOOR REMOVAL
GLASS REPLACEMENT
CARE OF GLASS
CARE OF PLATED PARTS
BLOWER SERVICE OR REPLACEMENT
GASKET AND SHIELD REPLACEMENT
WOOD
REPLACEMENTS
TROUBLESHOOTING
WARRANTY
NOTE: Changes, other than editorial, are denoted by a vertical line in the margin.
W415-1466 / 04.21.15
28
30
31