Download S19-120A
Transcript
S19-120, S19-120A Installation Installation Supplies Required: • • • • Teflon tape and pipe sealant Piping to 1" NPT water supply inlet Adequate supply pipe supports Minimum 4" (102 mm) drain to accommodate 30 gallons (115 liters) per minute discharge for shower waste • Sign-mounting hardware Step 1: Assemble components 1. Assemble the components as shown on page 4 (S19-120) or page 5 (S19-120A). 15¾" (400mm) 35⁄8" (92mm) 4½" (114mm) 25½" (648mm) Ø 3.1" (78.7mm) 84" (2134mm) to Floor • Apply pipe sealant to all male-threaded pipe joints. • Use the rubber grip pad provided or a strap wrench around pipes when tightening to prevent marring. Place the grip pad on the pipe, then put the wrench over the grip pad and turn the pipe with the wrench. 9" (229mm) • Bottom edge of showerhead should be 84" (2134mm) from the floor. Step 2: Connect water supply S19-120 IMPORTANT: Do not rely on Bradley’s Drench Shower to support supply piping. 1. Connect water supply piping to 1" NPT inlet on unit (piping supplied by installer). Provide adequate supports (supplied by installer) for supply pipe using pipe hangers or other means. 2. Mount the safety sign to the wall using signmounting hardware supplied by installer. 15¾" (400mm) 35⁄8" (92mm) 6" (152mm) Ø 10¾" (273mm) 84" (2134mm) to Floor 25½" (648mm) 9" (229mm) S19-120A Bradley • 215-148 Rev. Y; ECN 12-05-016A 5/30/2012 3