Download Technical Manual

Transcript
Component Replacement
9-14
9.6 Detector Assemblies
Replacement of the liquid nitrogen or electrically cooled detector assemblies is detailed below.
The procedures are broken up into Removal and Installation sections to more clearly describe
certain steps.
9.6.1 LN Detector
CAUTION
The detector’s beryllium window is extremely fragile. Read the precautions at the beginning of
this chapter before continuing.
Removal
1. Turn off the instrument power.
1. Remove the four rear panel screws which hold the enclosure cover in place. Remove the
enclosure cover by grasping it on the bottom of each side and sliding it directly forward.
1. Remove the screws securing the top left frame member to the chassis and remove the frame
member.
1. Remove the single screw which holds the dewar mounting frame to the bottom of the chassis.
1. Disconnect the preamp cable connector from the bias supply board located in the card cage.
1. Remove the sample tray and the metal plate which covers the sample chamber components
(or the special sample handling stage if installed). The cover plate is secured with special
vented screws, save these for reuse.
1. Remove the two socket head screws which fasten the filter wheel assembly to the baseplate.
Move the assembly aside, it is not necessary to disconnect its cables.
1. Remove the sample spinner drive assembly (if installed) screws and move it aside. It is not
necessary to disconnect its cable.
1. Remove the four screws which attach the detector to the sample chamber baseplate. These
screws have nylon insulators under them and are accessed from inside the sample chamber.
DO NOT remove any screws from the detector assembly itself as this will break its vacuum
seal. Support the detector neck area with one hand while removing the last screw.
1. Grasp the dewar and the neck and carefully guide the detector out the end of the instrument.
Keep an eye on the beryllium end until it clears the chamber area.
Installation
1. Transfer the o-ring from the old unit to the replacement unit (if it didn’t come with one
installed). If the o-ring is dirty, clean it off and reapply a thin coat of vacuum grease.
1. Transfer the insulator ring from the old unit to the replacement unit. Apply a few spots of
vacuum grease to the underside of the insulator ring, align the holes in the ring with the
flange screw holes and press it into place. The grease will hold the ring in place, making the
final installation easier.
1. Normally the replacement unit will have the dewar mounting frame installed. If so, skip this
step. If not, transfer the frame from the old to the new dewar. The insulating nylon shoulder
washers must be installed in the same way so that the frame is electrically isolated from the
dewar.
Spectrace Instruments QuanX Technical Manual