Download Operator`s Manual
Transcript
Operation 3.16 Towing Caution! The dumper is equipped with towing gear at the rear and a towing lug at the front. Only this equipment may be used for towing. Open the high-pressure circuit before towing the machine! Opening the high-pressure circuit 1 There are two HP pressure limiting valves on the pump under the floor panel, one on the upper left and the other on lower left. Proceed as follows: 2 ☞ Slacken locknut ws 14 (part 2) and unscrew it to the end of the screw ☞ Screw in the screw with allen key ws 4 (part 1) until you can feel a firmer resistance. ☞ Then screw in a further half revolution Caution! Fig. 41: Opening the high-pressure circuit Screwing in any further damages the valve! ☞ Retighten the locknut ☞ You can now slowly tow the machine (max. 1 kph) over a short distance (max. 1 km) ☞ Then put the valves back into operation again! Proceed in the reverse order to do this (unscrew the screw as far as it will go). BA 3001 En – Edition 4.0 * 345001b330.fm 3-27