Download Mechanical Specification
Transcript
Section 20 07 19 Piping Insulation Page 12 of 15 Baycrest Centre for Geriatric Care Apotex Building 5th Floor HHA #2151048-01 .1 On vertical pipes arrange circumferential overlap on adjacent sheets outside of sheet below and under sheet above. .3 PVC sheeting : .1 Hot piping: (a) overlap longitudinal edges and adjacent sheets by minimum of 50 mm (2 in) and staple fasten the sheets. (b) secure sheeting with colour matched tape around circumference, at least two places per section of sheet, and by stapling longitudional and circumferential edges. (c) do not seal edges with vapour barrier tape. (d) seal PVC fitting covers at throat and heel seams by stapling and secure over insulation by banding or taping ends to adjacent pipe finish covering with colour matched tape. .2 Cold and Dual Temperature piping: (a) overlap longitudinal edges and adjacent sheets by minimum of 50 mm (2 in) and seal longitudinal edges with vapor barrier coating adhesive for full depth and 100% coverage of overlap, (b) seal circumferential edges of PVC fitting covers with reinforced vapour barrier coating adhesive extending over adjacent pipe insulation section with an overlap of at least 50 mm (2 in). (c) seal PVC fitting covers at throat and heel seams by solvent bonding and secured over insulation with reinforced vapor barrier coating/mastic overlapping adjacent pipe insulation a minimum of 50 mm (2 in). 3.12 Mechanical Damage Protection - Indoors .1 Protect exposed pipe insulation extending up through a floor sleeve at floor line with 1.2 mm (18 ga) stainless steel jacket approximately 100 mm (4 in) high, secured to floor slab. Conceal fastenings by floor plate. .2 For piping systems using metal finishes, this protection cover replaces a portion of the specified pipe cover. .3 For piping systems using other finishes, this protection cover is in addition to the specified pipe cover. 3.13 Field Quality Control .1 The Consultant reserves the right to have protective finish coverings removed on up to 5% of all fittings, flanges, couplings, valves, and pipeline accessories to review the sealing of the insulation, at no change in cost. .2 If insulation sealing is found to be incorrect at any one location, remove the protective finish on all fittings, flanges, couplings, valves, and pipeline accessories for review. .3 Repair defective sealing and replace protective coverings at no change in cost. 3.14 Insulating and Finishes Tables .1 Table 1, 2 and 3 follows. Issued For Tender