Download KDA 864 - DPS Telecom

Transcript
Section 3 - Installation and Turn Up Procedure
I. Install
Hardware
·
A. Mount KDA
The KDA fits in either a 19" or 23" rack. The mounting brackets on the side of the unit can
be positioned for either 5" projection or flush mounting in a 19" rack or for 5-1/2" projection or 1/2" projection in a 23" rack. They may also be positioned for mounting against a
wall.
1. Determine which mounting configuration is required and orient the mounting brackets
as shown in Fig. 3.1.
19" Rack/
5" Projection
19" Rack/
Flush Front
23" Rack/
5-1/2" Projection
23" Rack/
1/2" Projection
Surface Mounting
Against Wall
SIDE VIEW
REAR
Fig. 3.1 - Positioning Mounting Brackets on the KDA
2. Attach each bracket with two 6-32 screws (provided in hardware bag).
3. Place the KDA in the rack and align the mounting holes in the brackets with the holes in
the rack rails. Secure each bracket with two 10-24 screws (provided in hardware bag). If
mounting against a wall, orient the KDA so the front panel can be observed. Mark mounting holes on wall and attach KDA with bolts or hollow wall anchors.
Cautions
Observe electrostatic precautions when servicing this equipment.
Observe polarity when connecting power to this unit.
There are no user serviceable parts inside the enclosure.
For intra-building connections, all interfaces must be connected through a shielded
cable that is grounded at both ends.
3-1