SECTION C4 ANCILLARY SYSTEM C4.1 C4.2 C4.3 Cable Trunking Conduit and Accessories Power Cable PART D - INSPECTION, TESTING AND CONMISSIONING DURING CONSTRUCTION PERIOD GENERAL REQUIREMENT D1.1 SECTION D2 General Requirement ROUTINE INSPECTION D2.1 D2.2 D2.3 Inspection of Materials and Equipment Delivered to Site Visual Inspection of Installation Inspection and Functional Test of Installed Works t SECTION D1 HANDOVER INSPECTION SECTION D4 TESTING & COMMISSIONING ra f SECTION D3 General Testing and Commissioning Procedures D D4.1 D4.2 Table of Contents Page 5 of 6 BRI_GS 2012 Edition