SECTION D3
HANDOVER INSPECTION
D
ra
ft
Before handover of any materials and equipment to the Architect or his representative, the
Contractor shall give due advanced notice of not less than three days and provide details of
date, time and list of items to be tested and commissioned to the Architect or his
representative for approval. The Contractor shall follow the details of the testing and
commissioning procedures as shown in Section D4.
Section D3
Page 1 of 1
BRI_GS
2012 Edition