Tender Document for NCSCM @ CHENNAI
Conduits which are to be taken in the ceiling slab shall be laid on the prepared shuttering work of the
ceiling slab over the reinforcement bars before concrete is poured. The conduits shall be properly
threaded and screwed into sockets, bends, junction boxes, outlet boxes and shall made water-tight by
using bituminous hemp yarn at the screwed ends. The conduits in ceiling shall be straight as far as
possible to facilitate easy drawing of wires through them. Before conduits are laid in the ceiling, the
positions of outlet points, junction boxes, etc. shall be set out clearly so as to minimize off-sets and
bends.
Conduits recessed in walls shall be secured rigidly by means of steel hooks/ staples at 0.8 Mtrs
intervals. Before conduit is concealed in the walls, all chases, grooves shall be neatly made to proper
dimensions to accommodate the required number of conduits. To outlet boxes, point control boxes,
inspection and draw boxes shall be fixed as and when conduit is being laid. The recessing of conduits in
walls shall be so arranged as to allow atleast 12 mm plaster cover on the same. All grooves, chases, etc.
shall be refilled with cement mortar and finished upto the wall surface with cement mortar and finished
upto the wall surface before plastering of walls is taken by the general contractor. Where conduits pass
through expansion joints in the building, adequate expansion fittings or other approved devices shall be
used to take care of any relative movement.
Running joints in conduits wherever necessary shall be rigidly held in aligned position by check nut
tightened on running side. After conduits, junction boxes, outlet boxes, etc. are fixed in position, their
outlets shall be properly plugged with PVC stoppers or with any other suitable material so that water
mortar, vermin or any other foreign materials do not enter into conduit system. All conduit ends
terminating into an outlet, draw box, junction box, point control boxes, etc. shall be provided with PVC
bushes, after the conduit ends are properly filled to remove burrs sharp edges. Concealed conduit
laying, above false ceilings shall be executed in similar manner described above.
Necessary GI pull wires shall be inserted into the conduit for drawing wires.
13.3
WIRING CONDUCTORS
13.3.1 GENERAL
All wiring conductors shall be PVC insulated, solid copper conductors of 1100 V grade. Wiring
conductors shall conform in all respects IS: 694-1977 Part-II (Latest Amendment).
Wiring conductors shall be supplied in red, black, yellow, blue colors for easy identification of wires.
The wiring conductors shall be supplied in sealed coils. The wiring conductors shall bear
manufacturer's trademark, name, voltage, grade, etc.
13.3.2 INSTALLATION OF WIRING CONDUCTORS
The wiring conductors shall not be drawn into the conduits until all the works of any nature that may
cause damage to the wires are completed. Proper care shall be taken in pulling the wires to see that no
damage occurs to the insulation of the wires.
The installation and termination of wires shall be carried out with due regard to the following:While drawing the wiring conductors, care shall be taken to avoid scratches and kinks, which cause
breakage of conductors. There shall be no sharp bends in the conduit system.
Insulation shall be shaved off like sharpening a pencil.
Strands of the wires shall not be cut for connecting to the terminals or lugs. The terminals shall have
adequate cross section to take all the strands.
Ends of the wiring conductors shall be terminated by using crimping sockets. Soldering of sockets shall
not be done. Ends of the conductors terminating into a switch/socket/connector shall be soldered.
Oxide inhibition grease shall be applied at all terminals and connections.