Download REF 90501 User Manual
Transcript
Preparatory Measurements - Baselines Continued Recreating Baselines Deleting Baselines To recreate a baseline for a particular energy or plan, the procedure is nearly identical to creating a baseline. If a plan or energy was created by mistake or is no longer needed, it can be deleted from the database using the following procedure. 1. Setup the QA BeamChecker Plus hardware as described in the section titled Step 1: Hardware Setup on page 12. 1. Connect the QA BeamChecker Plus to the PC. 2. Continue with Step 2: Prepare the Communication Software steps 1-4. 3. On the Baselines tab, select the energy or plan to be recreated. 2. Launch the Communication Software and ensure the correct database is loaded. 3. Select the desired room containing the plan or energy for deletion on the left side of the screen. 4. Click the Recreate This Baseline button. 5. Continue with steps 7-11 from Step 2: Prepare the Communication Software. The new baseline will be saved to the database. NOTE: Once a new baseline is created, it is not possible to revert to an older version, however previous baselines are archived in the database for continued comparison to pre-existing measurements. After a baseline is recreated, subsequent measurements will be compared to the new baseline. See the Data View Download, Trending, and Analysis section of this manual for more information. 4. Select the Baselines tab and confirm the Connection Status reads “Waiting” (yellow). 5. Select the desired plan or energy for deletion. 6. Click the Delete Plan or Delete Energy button depending on the room type. 7. Confirm the operation. CAUTION: Once an energy or plan is deleted, it CANNOT be recovered. 8. A .csv file will be exported which contains all baseline and measurement information for the selected plan or energy. Browse for a location to save this file and click OK to confirm. 15