Download User Manual - Escoglobal.com
Transcript
7 2.2.2 Shelves Installation To change the position of the shelves, remove and re-install the pilaster clips (front and back) at desired shelf level. 1. 2. 3. 4. 5. 1. 2. 3. 5 1 Open main door Open all inner doors o Rotate shelf 45 vertically Slide the shelf into the freezer chamber – on top of the pilasters Ensure the pilaster clips go through the holes on the shelf Put the first hook (1) into the pilaster hole (4a) Press upwards, then put the second hook (2) into the pilaster hole (4b) Install the shelf by aligning the third hook (3) with the shelf hole - hole located underneath the shelf (5) 3 4a 2 4b Ultra-Low Temperature Freezer