Download Software User Manual

Transcript
NLR-EFO-SUM-2
SUM
iss: 6 rev: 3
Return value
1 on success, 0 on failure.
public int set breakpoint(String taskname, int entrynr, boolean enable)
Description
Set a breakpoint on entry nr entrynr in task taskname in the scheduler. If parameter enable is
set to true the breakpoint is enabled. To disable it again set the parameter to false.
Parameters
taskname Name of the task.
entrynr Entry point number
enable true to enable, false to disable
Return value
1 on success, 0 on failure.
public int set trace(String taskname, int entrynr, boolean enable)
Description
Enable/disable tracing of entry points. Entry points are defined by specifying the number of the
entry point entrynr (numbering starts at 0) and the name of the task taskname. To enable a trace
set enable to true, to disable it set it to false. Tracing an entry point means that messages are
printed to the journal window.
Parameters
taskname Name of the task.
entrynr Entry point number
enable true to enable, false to disable
Return value
1 on success, 0 on failure.
public int where()
Description
Request the current position when the scheduler has stopped on a break point. The reply to the
message is automatically stored and can be retrieved by using where list. Normally the position
is sent to the client whenever the scheduler hits a breakpoint. So there is rarely any need to
request the position manually if you store the position on the client side (as is done in this tool.)
Return value
1 on success, 0 on failure.
public int step task()
Description
Perform one step (=one entry point) in the scheduler debugger.
Return value
1 on success, 0 on failure.
public int cont()
Description
Continue executing upto the next breakpoint in the scheduler debugger.
c Airbus Defence and Space
301